CLIENT:
PETRO-CANADA RESOURCES LTD.
$10,000
PROJECT NAME:
Hanlan-Rob Dehydration Facility VFD Study
SCOPE:
Measurement of Systems Harmonic Levels and Implementation of Static Filtering System
PROJECT MANAGER:
Ray Bartman, P.Eng.

Calgary office was requested to assist with an evaluation of Harmonic content and equipment reliability at this facility following the implementation of multiple VFD's. Upon completion of our site audit, a 5th Harmonic Static Filter was specified, installed and tested to alleviate voltage distortion problems related to isolated onsite generation.


CLIENT:
CALGARY CENTRE FOR PERFORMING ARTS
$3,000
PROJECT NAME:
Lighting Dimmer Rack Power Quality Survey
SCOPE:
To assist with the evaluation of operational problems on a small lighting dimmer rack, due to the influence from parallel connected loads.
PROJECT MANAGER:
Ray Bartman, P.Eng.

Calgary office was requested to assist with an evaluation of Harmonic content and equipment reliability at this facility following the implementation of new lighting dimmer racks. Upon completion of our site audit, a neutral current eliminator was specified, installed and tested to alleviate lighting problems experienced during facility productions.


CLIENT:
VARIOUS
$1,000
PROJECT NAME:
Various
SCOPE:
Power Quality Measurement, Report and Remedial Action
PROJECT MANAGER:
Various

Calgary office has been involved in many studies to determine condition of power system quality. These studies relate to actual concerns with equipment reliability or failure as well as baseline measurements for due diligence.

Our normal approach is to install sophisticated field monitoring equipment over a period of time, review and analyze results and submit a report with summary observations and recommendations. Our equipment is capable of capturing all power anomalies including impulse activities in the micro-second range as well as harmonics and voltage sag-surge.

Upon completion of report ARX has, as requested by the client, implemented corrective remedial actions such as filters, surge protection, arrestors or other mitigating devices. Normally follow up measurements are taken to confirm performance of equipment (see QiP2 Surge Pack under products).


CLIENT:
TELUS TOWER
$65,000
PROJECT NAME:
Harmonic Mitigation
SCOPE:
Supply and Install Harmonic Mitigation Equipment to Reduce System Distortion to Acceptable Levels
PROJECT MANAGER:
Roland Davidson, R.E.T.

At this facility computer loads has created distortion on the system which had exceeded tolerable limits. Measurements were then taken at several locations within the building and a program initiated to install passive harmonic cancellation equipment on a "worst case first" basis.

The harmonic content was measured before and after installation with performance confirmed in all cases. In finality the harmonic levels were reduced as per design and the equipment continues to provide trouble free service.

continues to provide maintenance test and inspections services as well as technical support to the new property managers. Now managed by Oxford Property Group.

 

NOTE: Client Contacts are "Available upon Request" ARX Engineering Ltd. respects Canadian Federal Privacy Legislation and will ensure our Clients are in agreement prior to making name and contact information available.


 


Copyright © 2007 All Rights Reserved
Web site design and maintenance by GeoHost