CLIENT:
|
ALTALINK/SNC ATP
|
$250,000
|
|
PROJECT
NAME:
|
East Airdrie Substation
|
|
|
SCOPE:
|
25KV Circuit Breaker Installation and Commissioning |
|
|
PROJECT
MANAGER:
|
Roland Davidson, R.E.T.
|
|
|
| Calgary resource provided for the erection and commissioning of two 25kV circuit breakers, Feeder Protection panels and SCADA at this substation. |
|
|
|
CLIENT:
|
City of Red Deer
|
$120,000
|
|
PROJECT
NAME:
|
Various Substations
|
|
|
SCOPE:
|
Substation Equipment Maintenance
and Repairs
|
|
|
PROJECT
MANAGER:
|
Roland Davidson C.E.T.
|
|
|
| ARX Engineering provides ongoing assistance to the city of Red Deer in the form of maintenance testing, emergency response and general assistance. |
|
|
|
CLIENT:
|
KETTLES HILL WIND FARM
|
$150,000
|
|
PROJECT
NAME:
|
Pincher Creek Wind Farm
|
|
|
SCOPE:
|
Substation Commissioning
|
|
|
PROJECT
MANAGER:
|
Roland Davidson, R.E.T.
|
|
|
| ARX Engineering provided substation commissioning including setup and calibration of all site protection and Utility Intertrip protective relaying. |
|
|
|
CLIENT:
|
NEXEN INC.
|
$125,000
|
|
PROJECT
NAME:
|
Cancarb Generation Plant
|
|
|
SCOPE:
|
Commissioning and Start-up of
Medicine Hat Generation Plant
|
|
|
PROJECT
MANAGER:
|
Roland Davidson, C.E.T.
|
|
|
CLIENT
CONTACT:
|
Veco Engineering
|
|
|
| ARX Engineering provided field services for the erection of the power plant 138KV step up transformer. In follow up we have provided continued assistance in the form of Annual Maintenance Testing and technical resources. Emergency services have been provided as necessary. |
|
|
|
CLIENT:
|
ELK VALLEY COAL CORPORATION
|
$50,000
|
|
PROJECT
NAME:
|
Greenhills, Fording River, Elkview and Coal Mountain Operations
|
|
|
SCOPE:
|
138 KV and 72 KV Substation Maintenance / Doble Testing
|
|
|
PROJECT
MANAGER:
|
Ray Bartman, P.Eng.
Roland Davidson, R.E.T.
|
|
|
|
ARX Engineering provides maintenance and repairs to Elk Valley Coal Corporations mines on a continuous basis. Substation equipment includes 138/69 KV breakers, protective relaying, transformers, on-line tap changers and disconnect switches.
|
|
|
|
CLIENT:
|
TRANSCANADA POWER |
$150,000 |
|
PROJECT
NAME:
|
Cancarb Generation Plant
|
|
|
SCOPE:
|
Commissioning and Start-up of Medicine Hat Generation Plant
|
|
|
PROJECT
MANAGER:
|
Roland Davidson, R.E.T.
|
|
|
|
Our scope of work involved commissioning of the 69 KV substation inclusive of 69KV breaker, transformer, switchgear and generators. A complex protection and synchronization scheme utilizing new technology required intensive calibration with specialized test equipment. As well, ARX Engineering assisted the contractor with erection and vacuum fill of the power transformer
|
|
|
|
|
CLIENT:
|
LAFARGE CANADA INC.
|
$30,000
|
|
PROJECT
NAME:
|
138 KV Substation - Exshaw Plant
|
|
|
SCOPE:
|
Substation Equipment Maintenance and Repairs
|
|
|
PROJECT
MANAGER:
|
Roland Davidson R.E.T.
|
|
|
|
Lafarge Canada Exshaw facility substation is maintained by ARX Engineering. Recent preventative maintenance encompassed maintenance on 138 KV breakers, metering equipment, protective relaying, disconnect switches and transformers. Repairs were required for the oil-filled transformer, on-line tap chargers and the disconnect switches.
|
|
|
|
CLIENT:
|
TRANSALTA UTILITIES
|
$150,000
|
|
PROJECT
NAME:
|
Utility Grid Resistance Measurement
|
|
|
SCOPE:
|
Substation Ground Grid Resistance Measurements
|
|
|
PROJECT
MANAGER:
|
Ray Bartman, P.Eng.
|
|
|
|
Calgary office provided Ground Grid Resistance Measurements and Soil Resistivity Testing at numerous Alberta substations. Specific test procedures based on IEEE Std. 81 were developed to ensure result integrity and repeatability.
|
|
|
|
CLIENT:
|
TRANSALTA UTILITIES
|
|
|
PROJECT
NAME:
|
Bearspaw Substation
|
|
|
SCOPE:
|
Transformer Repairs
|
|
|
PROJECT
MANAGER:
|
Jason Molstad, Project Manager
|
|
|
|
ARX Engineering provided 138KV transformer troubleshooting, bushing repairs and vacuum filling on an Emergency basis.
|
|
| |
|
CLIENT:
|
SNC ATP / ALTALINK
|
|
|
PROJECT
NAME:
|
Airdrie Sub Upgrades
|
|
|
SCOPE:
|
Install, Project Manage and commission
|
|
|
PROJECT
MANAGER:
|
Jason Molstad, Project Manager
|
|
|
|
This project entailed the install of three 25 kV substation breakers. Tie in was to an existing and operational utility substation.
|
|
| |
|
NOTE: Client Contacts are "Available upon Request" ARX Engineering Ltd. respects Canadian Federal Privacy Legislation and will ensure our Clients are in agreement prior to making name and contact information available.
|
|
|
|
|
| |