 |
|
|
| |
|
CLIENT:
|
TELUS
|
$120,000
|
|
PROJECT
NAME:
|
Internet Data Centre Metering / Monitoring System
|
|
|
SCOPE:
|
Supply / Install Meters. Install and Customize Software. Commission Total System and Provide Site Training.
|
|
|
PROJECT
MANAGER:
|
Ray Bartman, P. Eng.
Ian Bergeron, System Integrator
|
|
|
|
A complete energy monitoring and control system was designed and implemented for a high 9's computer centre where power reliability is of uppermost concern. This system is composed of 50+ meters, 10 RTUs and an Ethernet Communication backbone. As part of this project a remote viewing capability was incorporated along with an automatic alarm callout system. This will eventually link all Alberta Telus operations, which install the necessary hardware.
|
|
|
|
CLIENT:
|
MEDICINE HAT HOSPITAL
|
$100,000
|
|
PROJECT
NAME:
|
Power Monitoring and Breaker Control System
|
|
|
SCOPE:
|
Digital Metering and SCADA Installation
|
|
|
PROJECT
MANAGER:
|
Ian Bergeron, System Integrator
|
|
|
|
Magna IV Engineering Ltd. was selected to supply, install, and commission a dedicated power monitoring and breaker control system for this facility. This system incorporates 10+ meters, RTU's and allows for remote control of system circuit breakers from a centre site location.
|
|
|
|
CLIENT:
|
SHAW COMMUNICATIONS
|
$60,000
|
|
PROJECT
NAME:
|
Internet Data Centre Monitoring System
|
|
|
SCOPE:
|
Supply, Install Meters. Set Up Software For Monitoring and Remote Control
|
|
|
PROJECT
MANAGER:
|
Ray Bartman, P. Eng.
Ian Bergeron, Systems Integrator
|
|
|
|
A complete energy monitoring and control system was designed and implemented for a high 9's computer centre where power reliability is of uppermost concern. This system is composed of 15+ meters and a copper/Ethernet Communication backbone. This system currently links facilities in Alberta and BC to a central server located in the Calgary operations hub and provides historical and real time information to system operators.
|
|
|
|
CLIENT:
|
CARGILL FOODS
|
$85,000
|
|
PROJECT
NAME:
|
High River Power Monitoring System
|
|
|
SCOPE:
|
Meter and Software Installation
|
|
|
PROJECT
MANAGER:
|
Ray Bartman, P. Eng.
Ian Bergeron, System Integrator
|
|
|
|
A complete energy monitoring and control system including 20+ 7350/7300 Power Quality meters and ION Enterprise software was designed and implemented to allow for comprehensive energy management and monitoring of all system loads.
|
|
|
|
CLIENT:
|
DOW CHEMICALS
|
$25,000
|
|
PROJECT
NAME:
|
Prentiss Digital Metering System
|
|
|
SCOPE:
|
Meter Installation. Software Implementation, Software Customization and Client Training
|
|
|
PROJECT
MANAGER:
|
Ray Bartman, P. Eng.
Ian Bergeron, System Integrator
|
|
|
|
Work included installation and commissioning of 11 7600/7700 ION power meters and ION Enterprise Software to allow for continuous monitoring of system loads. Power quality monitoring and automatic report generation formed an integral part of this project.
|
|
|
|
CLIENT:
|
CANADA PUBLIC WORKS
|
$80,000
|
|
PROJECT
NAME:
|
Harry Hayes Building Metering System
|
|
|
SCOPE:
|
Meter and Software Installation
|
|
|
PROJECT
MANAGER:
|
Ray Bartman, P. Eng.
Ian Bergeron, System Integrator
|
|
|
|
A complete energy monitoring and control system including 12 7650/7550Power Quality meters and ION Enterprise software was designed and implemented to allow for comprehensive energy management and monitoring of all system loads.
|
|
|
|
CLIENT:
|
WEST FRASER MILLS RANGER LUMBER
|
$50,000
|
|
PROJECT
NAME:
|
Digital Metering System
|
|
|
SCOPE:
|
Meter, Supply and Install. Software Implementation, Software Customization and Client Training
|
|
|
PROJECT
MANAGER:
|
Ray Bartman, P. Eng.
Ian Bergeron, System Integrator
|
|
|
|
Software and computer were installed on existing meter installation. Work included communication wiring and commissioning. As a point of interest this project included integration of Multilin motor protection relay information into the power measurement software. In addition gas and water consumption were brought into the "screens" for a complete analysis of the plants utility use and costs versus production. Again, after completion of the project training and follow-up were part of the ongoing service.
|
|
|
|
CLIENT:
|
LUSCAR LTD.
|
$150,000
|
|
PROJECT
NAME:
|
Coal Valley Mine / Cardinal River Mine
|
|
|
SCOPE:
|
Digital Metering and SCADA Installation
|
|
|
PROJECT
MANAGER:
|
Ray Bartman, P. Eng.
|
|
|
|
Magna IV Engineering Ltd. was selected to supply, install and commission a dedicated power monitoring system for these facilities. Wireless communications provided data linking between various locations throughout the mine. The projects included specification of 69KV metering transformers and installation of Power Measurement Ltd. metering equipment and software. Supply and installation of support hardware such as UPS and communication interfaces was included.
|
|
| |
|
|
CLIENT:
|
NOVA CHEMICALS OFFICE
|
$45,000
|
|
PROJECT
NAME:
|
Metering Protection Upgrade
|
|
|
SCOPE:
|
Communication Requirements for Interface with PML and SEL Products
|
|
|
PROJECT
MANAGER:
|
Ray Bartman, P. Eng.
|
|
|
|
Magna IV Engineering (Calgary) Ltd. was requested to integrate new microprocessor metering and protection instrumentation. All devices were to communicate via SCADA monitoring system. Work continues with further additions and upgrades plant wide.
|
|
| |
|
NOTE: Client Contacts are "Available upon Request" ARX Engineering Ltd. respects Canadian Federal Privacy Legislation and will ensure our Clients are in agreement prior to making name and contact information available.
|
|
|
|
|
| |